Blue Line single tracking system with DiBloC
8th May 2025 | 45 sec read


The Challenge
How to deliver a safe single tracking system between 28th Avenue station and Terminal 2 on the Blue line to maintain service during new construction.
At the time of implementation, Metro Transit did not have reverse running signalling implemented on the Blue Line System.