Ambulance asset tracking

Ambulance asset tracking

13th November 2026 | 2 min read

The Challenge

An ambulance can hold up to 200 items required to carry out emergency aid whilst in service, ranging from stretchers to defibrillators. 

When an ambulance arrives at an emergency scene, there is a possibility that if there are multiple incidents, there will be multiple ambulances at the scene. As such any equipment used for the incident may not leave the scene in the same vehicle that it arrived in. 

This was proving to be a challenge for our major UK healthcare provider and it was finding: 

  • The high-stress demands on emergency responders meant valuable assets and equipment were very frequently being misplaced. 
  • Not knowing what equipment was in the vehicle at the start of the day meant the emergency services were struggling to track their equipment.
  • With budget constraints, any solution needed to be both cost-effective and add real value to the emergency services.
  • Tracking the equipment saves the emergency services money in preventing lost or stolen kit.

The Solution

In order to support these challenges, Unipart was asked by our healthcare customer to support asset tracking within each ambulance.

Working with the customer, Unipart developed a bespoke asset tracking solution tailored specifically to the customer’s operational requirements, that meant they would know exactly what equipment was in each ambulance, at the start of every day. We did this by: 

  • Using RFID tags to track individual equipment inside the vehicle, which was coupled with an antenna situated inside the vehicle. 
  • If any equipment went out of range, we had created a diagnostic hub that would log the time and date to show the equipment had left the vehicle. 

The Impact

Unipart’s rapid execution and disciplined project delivery ensured the end-to-end deployment of the asset tracking solution was completed seamlessly. The customer received: 

  • Full development of the bespoke asset tracking system, from concept to implementation, within a six month period.
  • The project was delivered on-schedule, ahead of delivery schedule, and cost-effectively.

 

Get in touch

Leverage Unipart's industry-leading expertise to transform your business

Get in touch